首页 体育内容详情
足球分析师:RM1.8 billion allocated for 2022 federal road maintenance

足球分析师:RM1.8 billion allocated for 2022 federal road maintenance

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

薅羊毛电报群www.tel8.vip)是一个Telegram群组分享平台。薅羊毛电报群包括薅羊毛电报群、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。薅羊毛电报群为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

Works Minister Fadillah Yusof says the maintenance of federal roads is important to keep them in good condition. – The Malaysian Insight file pic, August 20, 2022.

A SUM of RM1.08 billion has been allocated for maintenance of federal roads throughout the country this year, said Works Minister Fadillah Yusof. 

He said of this amount, RM150 million is for maintenance works in the southern zone covering Pahang, Johor and Negri Sembilan. 

“Maintenance works in Pahang involve an expenditure of RM66.08 million, followed by Johor (RM60.9 million) and Negri Sembilan (RM23.63 million). 

“These maintenance works are important to keep these roads in good condition,” he told reporters in conjunction with the FTRoadpedia South 2.0 Tour in Klang today. 

Fadillah said proposals for road upgrade works on Federal Road FT050 from Ayer Hitam to Kluang in Section 33.8 until the Kluang Stadium junction in Section 49.1 would be submitted to federal authorities next year.

,

足球分析师www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。足球分析师上足球分析专家数据更新最快。足球分析师开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Fadillah said the Phase 3B project, with an estimated value of RM385.13 million under the 12th Malaysia Plan, is aimed at reducing fatal accidents throughout the alignment. 

He said it is a continuation of the Phase 3A project worth RM219 million, which is under construction and expected to be completed in October 2024. 

“This location has recorded the most accidents in Malaysia due to the absence of road shoulders, medians and U-turns, with 52 accidents reported from 2020 to June 2022. 

“This road is the main toll-free route connecting Batu Pahat, Kluang and Mersing districts, and it will involve construction work on road shoulders, medians, U-turns and related works,” he added.

He also said an additional allocation of RM600,000 has been approved to upgrade streetlights along Federal Road FT050 to improve various aspects of road travel, especially towards the safety of road users. – Bernama, August 20, 2022.


转载说明:本文转载自Sunbet。
  • USDT自动充提教程网(www.6allbet.com) @回复Ta

    2022-08-28 00:09:19 

    近日,一条消息在圈群中流传,配图显示,高速出入口附近,身着蓝色防护服的工作人员抱着黑色仪器面向车辆,另一名工作人员手持机器上则呈现雷达扫描的图案。消息还配了一段文字,称“上海各个高速路出口都用上了生命探测仪,防止货车里藏有从上海逃出来的人”。可以拍成电视剧了。

发布评论